精品无码av无码专区,热re99久久精品国产99热,国产人与禽zoz0性伦,亚洲成AV人综合在线观看

WELCOME TO OUR WEBSITE!中文站
Current Location:Home >PRODUCTS>HNPDM-1802>HNPDM-1802

Products List

On-line+
HNPBL-1000
HNPDM-1802
HNPJF-1500B
HNPRT-18B
HNPRX-1000B
HNPRX-1000C
HNPSE1000
Portable+
A-B SF6

Contact Us

  • Phone:0519-83113788
  • Fax:0519-83113786
  • E-mail:hnppower@126.com
  • Address:400 Changshun Road, Wujin District, Changzhou
  • Products Name:

  • System Overview

    The transformer DC magnetic bias monitoring system can monitor the DC magnetic bias at the neutral point of the transformer in real time, and once DC over-standard at the neutral point of the transformer occurs (this system can be extended to monitor the vibration and noise of the transformer), the operator can take measures such as load reduction to prevent major failure of the transformer and system. An open-loop current sensor is adopted for current detection of the system to achieve fully isolated sampling mode, and the advanced microprocessor technology and unique transient parameter testing technology are used for linear processing and calculation; with extremely high reliability and safety and relative cheap price, this system can be installed in each transformer for real-time detection to achieve centralized monitoring.

    Technical Indexes

    • Working environment

    Working voltage: AC 220V±10%, 50Hz,<5W

    Ambient temperature: -40°C ~ +70°C

    Ambient humidity: ≤95%RH

    • Monitoring parameters

    Measured value: DC (average value), AC/DC valid value

    Measurement range of current: AC/DC, peak 0~200A

    Measurement accuracy: 1%

    Resolution: 0.05%

    Data measurement speed: once/second

    • Other technical indexes

    System capacity: 80 local modules

    CAN network structure – network rate:<500Kbps

    RS485 structure – network rate: ≤2400bps

    The life cycle of the system is 10 years or more.


    Function Features

    • Continuously monitoring and recording AC/DC flowing through the neutral point of the transformer in real time, judging the status of the equipment monitored, and alerting of potential faults.

    • With transient over-voltage protection measures, there is no influence on safety operation of the equipment on site, and it shall be ensured that the down conductor is grounded reliably to meet the corresponding through-current capability.

    • Automatic acquisition of equipment status parameters, signal conditioning, analog-digital conversion, data pre-processing, and transmission to the upper unit.

    • Acceptance of control commands transmitted by the upper unit, such as parameter configuration, data calling, time synchronization and forced restart.

      圖片5.png

    主站蜘蛛池模板: 桐乡市| 肥城市| 桐庐县| 沁阳市| 石棉县| 贡山| 扎兰屯市| 浮山县| 建德市| 公安县| 兰州市| 新泰市| 庆云县| 镇宁| 兴安盟| 广丰县| 大荔县| 阿图什市| 洛南县| 清涧县| 丰原市| 西安市| 鄂州市| 雷山县| 沙洋县| 嵩明县| 通城县| 蕲春县| 江城| 阳江市| 阿拉善右旗| 农安县| 宁德市| 萍乡市| 通辽市| 阜城县| 扎兰屯市| 沧源| 息烽县| 璧山县| 新津县|